Wind power plant of La Guenelle

The La Guenelle plant is composed of 11 Vestas V90 turbines of 2MW each.
The plant was connected to the grid in 2014. 
The special purpose vehicle was audited and negotiated by GEP who had it acquired by a German investor.
At the same time, GEP signed with this investor a contract of assistance to the Project’s Owner and a "turnkey" construction contract.