Wind power plant of Montbray & Margueray

The Montbray & Margueray plant is composed of 10 Senvion MM82 turbines of 2MW each. 
The plant was connected to the grid in 2015. 
The special purpose vehicle was audited and negotiated by GEP who had it acquired by a German investor.
At the same time, GEP signed with this investor a contract of assistance to the Project’s Owner and a "turnkey" construction contract.